Dismantling of the Linz Power Plant
- Location: Linz, Austria
- Construction time: June 2022 to July 2022
- Key figures: The boiler, weighing 600 tons and a height of 55 meters, was carefully lowered in 4-meter intervals, with a controlled descent rate of 20 meters per hour.
- Equipment:
- 4 pcs. LH200
- 1 pcs. HPU4-14
|