Precision in Power Plant DecommissioningLichterfelde Power Plant Lowering of Three BoilersAs part of the decommissioning of the Lichterfelde power plant, DSD Heavy Lift was commissioned to carry out the controlled lowering of three boiler units. The works took place within the existing plant structure and required precise planning as well as safe load handling under challenging space constraints. Using our strand jack lifting system, the boilers were safely taken over, lowered in a controlled manner, and prepared for the subsequent dismantling works. The precise coordination of lifting technology, demolition activities, and safety requirements ensured an efficient and controlled execution. Decommissioning projects of this scale demand experience, precision, and absolute control over every movement of the load. With our expertise, we make an important contribution to the safe dismantling of complex industrial facilities. |