Efficient Storage Optimization with Innovative Lifting and Stacking System

Lifting of a Warehouse Hall Roof

  • Location: Reichenbach, Bern, Switzerland 
  • Construction time: 19.04. to 08.05.2024 
  • Equipment

   - 6 pcs. HPU4-9 

   - 21 pcs. SP45 

   - 21 units lifting constructions 

  • Hall Roof specifications:

   - Total length: approx. 44.5 meters 

   - Total width: approx. 28 meters 

   - Total weight: approx. 70 tons 

  - Lifting height: 5 meters 

To maximize storage space, Bhend Gerüstbau AG was looking for a clever and space-saving solution. Our answer was a lifting and stacking system that takes up much less space compared to traditional cranes. With this system, we successfully lifted the 70-ton hall roof by 5 meters within one workday.

Through precise planning and careful execution, our experienced team of supervisors and technicians managed to lift the hall roof safely and efficiently, always adhering to the highest safety and quality standards. The seamless collaboration with Bhend Gerüstbau AG allowed us to complete the project on schedule, effectively increasing storage capacity for scaffolding materials.

This project highlights the expertise of DSD Heavy Lift AG in the field of heavy lifting technology and strengthens our position as a trusted partner for lifting and assembly projects in the industrial sector.