Temporary Stabilisation of an Offshore Access BridgeOffshore Black SeaTo ensure the structural integrity of an offshore access bridge in the Black Sea, we carried out a temporary stabilisation of the structure. Before the permanent repair solution could be installed, several structural elements were overloaded. Using strand jacks, we tensioned and stabilised the bridge, creating the required load-bearing reserve for the erection of the scaffolding system. This solution ensured the safety of the facility and prepared the structure for the subsequent repair works. |