Dismantling of the Linz Power Plant

  • Location: Linz, Austria
  • Customer: PORR Umwelttechnik GmbH
  • Construction time: June 2022 to July 2022
  • Key figures: The boiler, weighing 600 tons and a height of 55 meters, was carefully lowered in 4-meter intervals, with a controlled descent rate of 20 meters per hour.
  • Equipment:

   - 4 pcs. LH200

   - 1 pcs. HPU4-14