nach oben

Revision FSM Bridge Istanbul

  • Location: Istanbul, Türkiye
  • Customer: IHI Infrastructure Systems Co. Ltd
  • Duration of assignment: January 2023 to January 2024
  • Construction type: Replacement of 120 hangers on the Fatih Sultan Mehmet Bridge in Istanbul while the bridge is in continuous use (over 100,000 vehicles per day)
  • Key figures: The suspension bridge is 169 meters high and 1'090 meters long
  • Equipment:

   - 8 pcs. LH200

   - 8 pcs. VS200

   - 5 pcs. HPU2-4