nach oben

Successful renovation

Revision FSM Bridge Istanbul

  • Location: Istanbul, Türkiye
  • Duration of assignment: January 2023 to January 2024
  • Task: Replacement of 120 hangers on the Fatih Sultan Mehmet Bridge in Istanbul while the bridge is in continuous use (over 100,000 vehicles per day)
  • Key figures: The suspension bridge is 169 meters high and 1'090 meters long
  • Equipment:

   - 8 pcs. LH200

   - 8 pcs. VS200

   - 5 pcs. HPU2-4

Here’s a simplified English version for your website:

DSD Heavy Lift AG successfully completed the renovation of the Fatih Sultan Mehmet Bridge in Istanbul. While over 100,000 vehicles crossed the bridge daily, a total of 120 hangers were replaced over the course of a year. This suspension bridge spans the Bosphorus, connecting the European and Asian sides of Istanbul, with a total length of 1,510 m and a span of 1,090 m between the pylons. The pylons stand 111.1 m tall, rising 98.2 m above the roadway. This project showcases our expertise in challenging conditions and our ability to execute complex construction tasks with precision and efficiency.