Roof Lifting for Structural Reinforcement to Support a Photovoltaic SystemPrecision for Greater SustainabilityTo accommodate the installation of a photovoltaic system, three existing roof trusses required reinforcement to safely support the additional loads. To enable these modifications, we carried out a controlled roof lift of 40 mm, creating the necessary conditions for the installation of tension rods. Although this was a compact, one-day operation with a lifting load of approximately 5 tonnes, it required the highest level of precision. Through careful planning and the targeted use of our lifting technology, the work was completed safely, efficiently, and on schedule – a small project with a lasting contribution to sustainable infrastructure. |