SPMT transports Lock Gates Gelsenkirchen
- Location: Gelsenkirchen, Germany
- Construction time: May 2023 to June 2023
- Task: Tilt and move two lock gate panels using two SPMT units for dismantling and installation.
- Key figures: Weight per lock gate 41 tons
- Equipment:
- 2 pcs. 4 axles
- 2 pcs. PPU
|