Building lifting to add additional storeysSwiss Chalet LiftFor a planned additional storey, an existing chalet weighing approximately 9 tonnes was lifted by 2.5 metres. The building lift was completed within one working day. The chalet was raised in a controlled manner to the required height and positioned for the subsequent construction works. The successful lift created the necessary conditions for the planned extension of the existing building. |